Common jobs
| Job | Size | Cubic yards | 80 lb bags | 60 lb bags |
|---|---|---|---|---|
| Patio slab | 10' × 10' × 4" | 1.36 | 62 | 82 |
| Shed pad | 8' × 12' × 4" | 1.30 | 59 | 79 |
| Garage floor | 24' × 24' × 6" | 11.73 | 528 | 704 |
| AC pad | 3' × 4' × 4" | 0.16 | 8 | 10 |
| Wall footing | 20' long, 16" wide, 8" deep | 0.72 | 33 | 44 |
| Deck piers | 6 piers, 10" across, 3' deep | 0.40 | 18 | 24 |
| Fence post holes | 10 holes, 8" across, 2' deep | 0.28 | 13 | 18 |
| Mailbox post | 1 hole, 10" across, 2' deep | 0.04 | 2 | 3 |
How much concrete is in a bag
An 80 lb bag of concrete mix makes about 0.60 cubic feet once it's mixed. A 60 lb bag makes about 0.45 cubic feet. A cubic yard is 27 cubic feet, so it takes 45 of the 80 lb bags, or 60 of the 60 lb bags.
The calculator rounds bags up. You can't buy part of a bag, and running out halfway through a pour is worse than one bag left over.
How this is worked out
For a slab, pad or footing, length times width times thickness gives the volume. For a round pier, it's pi times the radius squared times the depth, times the number of piers. Every length is rounded to the nearest sixteenth of an inch first, and pi is 355/113, the same value Handyman Calc uses.
Then the waste is added: 10% unless you change it. That covers spills, an uneven base and forms that bow. The math is done in exact fractions, so a job that comes to a whole number of bags isn't pushed up one by a rounding error.
Want it already worked out? There's a concrete bags chart below for slabs from 4 × 4 to 12 × 16 ft, with a PDF to print.
Concrete bags chart for slabs
There's one table for 4 inch slabs and one for 6 inch slabs. Each row gives the bag count for 80 lb and 60 lb bags. The last column is cubic yards, for when you'd rather order ready-mix.
4 inch slab
| Slab | 80 lb bags | 60 lb bags | Cubic yards |
|---|---|---|---|
| 4 × 4 ft | 10 | 14 | 0.22 |
| 6 × 6 ft | 22 | 30 | 0.49 |
| 8 × 8 ft | 40 | 53 | 0.87 |
| 10 × 10 ft | 62 | 82 | 1.36 |
| 10 × 12 ft | 74 | 98 | 1.63 |
| 12 × 12 ft | 88 | 118 | 1.96 |
| 12 × 16 ft | 118 | 157 | 2.61 |
6 inch slab
| Slab | 80 lb bags | 60 lb bags | Cubic yards |
|---|---|---|---|
| 4 × 4 ft | 15 | 20 | 0.33 |
| 6 × 6 ft | 33 | 44 | 0.73 |
| 8 × 8 ft | 59 | 79 | 1.30 |
| 10 × 10 ft | 92 | 123 | 2.04 |
| 10 × 12 ft | 110 | 147 | 2.44 |
| 12 × 12 ft | 132 | 176 | 2.93 |
| 12 × 16 ft | 176 | 235 | 3.91 |
The chart is on one page in the printable PDF, US Letter size.
On your phone, on the job site
On a phone, Handyman Calc has this concrete screen and prices the job from your bag or yard price as well. There are fourteen more calculators in it, it works with no signal, and it's free.
▶ Try it in your browser Download on the App Store ▶ Get it on Google Play
Charts worked out with the same math:
More calculators: